zhengyuan

Pre-production Setup

Mold installation and process settings are confirmed before production.

Before starting production, we complete mold installation, equipment readiness checks, and process parameter setup. Key settings such as temperature, pressure, speed, and auxiliary systems are confirmed based on the approved process sheet to ensure stable startup and reduce trial-and-error time.

01

Key Controls

  • Mold installation & safety check
  • Machine parameter setup per process sheet
  • Temperature / pressure / speed confirmation
  • Robot / fixture position verification (if used)
  • Pre-heating and readiness confirmation before trial run
02

Records (Available Upon Request)

  • Setup checklist / process sheet (masked)
  • Parameter setting photo (masked)
  • Equipment readiness record (masked)

Process Flow

REQUEST A QUOTE

Upload Your Drawing. Get a Fast Quote.

Send CAD files or samples for evaluation. Quote & DFM suggestions within 12 hours (Mon–Fri). NDA available.

What to Send

STEP/IGES/STP/PDF/DWG + qty + material + surface finish

What You Get (12h)

Cost breakdown + lead time + DFM suggestions

Confidential & Reliable

NDA available. Files kept confidential.

Request a Quote

Send drawings or samples. We’ll reply with a quote and DFM feedback.

拖拽文件到此处,或者
Accepted file types: stp, step, igs, iges, pdf, dwg, dxf, stl, zip, rar, Max. file size: 256 MB.